V10 Checking…
SCE Pole Load Worksheet v10
v68
Walk & Talk
SCE Pole Load Worksheet · Speak your pole number to begin
Powered by HyperIntel
V10default
V11legacy
No job file loaded — tap to upload SAP export
Walk & Talk Powered by HyperIntel
Tap Walk & Talk to begin
Pole Header
Pole No —
Date —
Planner —
Work Order —
District —
Circuit —
Substation —
Species —
Height —
Class —
Year In —
Loading —
Wind —
Grade —
AGL —
GLC —
Brand Ht —
In Ground —
Damage —
Equipment
Anchors

⛔ NO ACCESS — This pole is flagged as inaccessible. No structural data captured.

📡 Offline — submission queued. Will auto-send when connection restores.

Current Field
Loading…
Heard
Turn voice on below and speak
Current Pole — Header
Pole No —
Date Fielded —
Type (Species) —
Height —
Class —
Str Location —
GPS Acquiring…
Loading / Wind —
Pole Review — Confirm Before Submit
Voice Revision (SF-003)
Say a field name and new value to correct before submitting.
Correction heard
Use the voice bar to speak a correction
Use the voice bar below to speak a correction.
✅
Pole Submitted
Pole —
—
Session
Work Order —
Poles Submitted 0
Review & Confirm
SCE Pole Load Worksheet
✓
Pole Submitted!
Report filed successfully
Pole No —
Work Order —
Submitted —
Poles this session —
⚑ Field feedback — save this flag?